Browse Our Safety Categories:

Read Our Latest Blogs:

Safety Tip of the Week:

Week of October 14, 2019

Hydration and Electrolyte Replacement in the Winter

Hydration is just as important in the winter as it is in the summer.  Realizing that you are dehydrated when it is cold outside is more of a challenge.  We perspire underneath the layers of clothing that keep us warm in the winter.  Perspiration is absorbed by our clothing and we think we sweat only when it is hot outside.  That is so far from the truth!  When in an industrial setting in the winter months we need to be more aware of hydration.  We tend to drink less and dehydration is less obvious.  We are more prone to accidents in the workplace while operating machinery or working at a job site when we are dehydrated.  Be aware of this possibility and remember that the temperature outside is not as important as the temperature inside of your body.  To combat dehydration, look at the All Natural Sword Electrolyte Replacement products here! 


Haws Combination Shower & AXION MSR Eye/Face Wash With Stainless Steel Bowl - 8300

Regular Price: $1,075.00
On Sale For: $763.23
  • SKU: 8300
  • Weight: 55.00 lbs
Haws Combination Shower and Eyewash Model 8300 is bright and easily identified in a facility because of  it's bright yellow stripes on top of it's safety green color.

  • AXION MSR™ eyewash head is antimicrobially treated
  • Features a round 11" stainless steel bowl, with an eyewash head and integral flow control that can be user configured as either an eyewash or eye and face wash on site.
  • Eyewash streams provide zero vertical velocity stream engineering with even laminar flow for enhanced comfort, stability and effectiveness.
  • AXION MSR™ ABS plastic drench shower head with flow control delivers dispersed flow for uniform drenching.
  • Also features a stainless steel push flag for eyewash activation, stainless steel pull rod for shower activation, mesh in-line eyewash strainer to collect line debris, and ball valves with stainless steel ball and stem for durability.
  • Pipe and fitting: 1-1/4" Schedule 40 hot-dipped galvanized steel. Supply and Waste: 1-1/4" IPS.
Customer Reviews
(0.00)
# of Ratings: 0
There are no comments for this product.
Copyright © 2014. All Rights Reserved
  • Connect With Us: